Water & Sanitary Sewer Main Installation

Main installation and extensions, wet taps, manholes, and the state approvals that come with them.

Not every job is a service line. JWSR installs and extends water and sanitary sewer mains, sets manholes and structures, makes wet taps and live connections, and handles the road opening, traffic control and restoration that comes with working in a right of way. We also tell you early which approvals sit with the state rather than the town, because on main work that is usually what sets the schedule.

How we do it

Mains are a different animal from service lines. A main is the pipe everyone else connects to, so the depth, the bedding, the joint restraint and the compaction have to be right the first time, and the approvals sit with the state and the utility rather than with a homeowner.

We install and extend water and sanitary sewer mains, set manholes and structures, make wet taps and live connections where the system cannot go down, and handle the road opening, traffic control and restoration that comes with working in a right of way. Testing, flushing, disinfection and video inspection get done and documented to whatever the receiving authority asks for.

The part that catches developers out is timing. A sewer main extension is a state permit, not a town permit, and it needs to be in motion long before anyone wants pipe in the ground.

What's included

  • Water and sanitary sewer main installation
  • Main extensions and tie-ins
  • Wet taps and live connections
  • Manholes, structures and valve settings
  • Pressure testing, flushing and disinfection
  • Road opening, traffic control and restoration
Our work
Common questions

Water & Sewer Mains: what people ask us

What is the difference between a main and a service line?

A service line feeds one property. A main is the pipe in the street or the easement that services connect to. Mains are larger, deeper, built to the utility's standard rather than a plumbing code, and the approvals run through the state and the utility instead of a homeowner's permit.

Do I need a permit to extend a sanitary sewer main?

Almost certainly a Treatment Works Approval from NJDEP. The state names sewer mains directly in what a TWA authorises, so it is a state-level permit rather than something the town issues, and it belongs at the front of the schedule.

Can you do a wet tap or a live connection?

Yes. Where the system cannot be taken out of service, we make the connection live and coordinate the shutdown window, the valve work and the notification with the utility.

Do you set manholes and structures?

Yes, along with the pipe: manholes, valve boxes, hydrants where they belong on a water main, and the castings set to final grade after paving.

Who handles the testing and the paperwork?

We do the pressure testing, flushing, disinfection and video inspection to what the receiving authority requires, and hand over the documentation. Which tests apply depends on the utility, and we confirm that before we start rather than after.

Can you work in a county or state road?

Yes. Road opening permits, traffic control and restoration to the road authority's standard are part of the job, and they are also part of the price, so we would rather scope them honestly up front than surprise you.

Before the machines show up

What New Jersey actually requires

Most of the surprises on this kind of job are regulatory, not mechanical. Here is what binds the work in our counties, with the state sources so you can read them yourself.

WhatWhat it means for your project
A sewer main extension is a state permitNJDEP is explicit that Treatment Works Approval permits authorise the construction and operation of wastewater collection and conveyance facilities “including treatment plants, pumping stations, interceptors, sewer mains and other collection holding and conveyance systems”, issued consistent with N.J.A.C. 7:14A. If your project extends the sanitary sewer, a TWA is on the critical path.
How deep the main sitsNew Jersey's sanitary sewer design standard requires sewers, force mains and laterals to be at least 3 feet below finished grade measured to the top of the pipe. Real depth is usually set by the invert you have to reach and the slope needed to get there.
Connecting to a public water systemPhysical connections to a public community water system are regulated by NJDEP under N.J.A.C. 7:10-10, and backflow prevention requirements attach to the connection. Which approvals apply depends on the purveyor and the nature of the connection, so confirm it with them before design is final.
Site disturbanceMain work is linear and it adds up fast. Over 5,000 square feet of disturbance and the job needs a certified soil erosion and sediment control plan from your county Soil Conservation District, which has 30 days to grant or deny.

Sources: NJDEP Division of Water Quality: Treatment Works Approvals (N.J.A.C. 7:14A) · N.J.A.C. 7:14A-23.6, Sanitary sewer design · NJDEP Water Supply & Geoscience: Physical Connection Permits and backflow prevention (N.J.A.C. 7:10-10) · N.J.S.A. 4:24-39 et seq., the NJ Soil Erosion and Sediment Control Act (statute text). This is general information, not a ruling on your property. Your county Soil Conservation District and your town have the final say for your address.